[ B200 MARKET RATES · JULY 2026 ]

The same chip.
$3.50 to $14.24.

An NVIDIA B200 is an NVIDIA B200 wherever you rent it. The price is not about the silicon — it is about what the provider underneath it is paying for land, power, and sales. Here is the published market, with sources.

$6.12

Median B200 on-demand rate across independent multi-provider trackers, July 2026

4.1×

Spread between the cheapest and dearest published on-demand B200 — identical silicon

$14.24

AWS list price per B200 GPU-hour (p6-b200.48xlarge ÷ 8)

$4.50

SmartTec reserved target rate — about 28% under the market median

[ PUBLISHED B200 RATES · PER GPU-HOUR ]
ProviderConfigurationCategory$/GPU-hrRelative
AWSp6-b200.48xlarge · 8× B200Hyperscaler$14.24
Oracle Cloud8× B200 bare metalHyperscaler$14.00
CoreWeaveHGX B200 · 8× B200Neocloud$8.60
Together AIB200 on-demandNeocloud$8.19
NebiusB200 on-demandNeocloud$7.15
Vast.aiB200, third-party hostsMarketplace$7.12
Lambda1× B200 SXM6 · 180 GBNeocloud$6.69
ModalB200 on-demandNeocloud$6.25
HyperstackB200 on-demandNeocloud$6.00
RunPodSecure Cloud · B200Neocloud$5.89
[✓]SmartTecReserved 1-year · Mead, OK · Q4 2026SmartTec$4.50
Vultr8× B200 configurationNeocloud$3.50
HyperbolicAggregated capacityMarketplace$3.50

Published on-demand list rates per B200 GPU-hour except the SmartTec row, which is a 1-year reserved rate for capacity targeting power-on Q4 2026. Figures as of July 25, 2026 from the sources listed below; rate cards change without notice. Azure prices the newer GB200 NVL72 platform — a different part — at roughly $27/GPU-hr, and is excluded from this B200 table rather than mixed into it. SmartTec on-demand B200 is published separately at $4.80/GPU-hr on the pricing page.

“Nobody is paying four times more for a better B200. They are paying for someone else's metro real estate, retail power bill, and enterprise sales team.”

— Yasir Jahangir, Co-founder & COO, SmartTec
[ THREE THINGS THIS TABLE DOES NOT TELL YOU ]
These are list prices, not quotes.

Every figure below is a published rate card. Real contracts move on term length, volume, region, and how badly the provider wants the logo. Serious buyers at CoreWeave-class providers are quoted, not billed off a website — assume a 15–25% discount is available on 6-month-plus commitments, and treat this table as the ceiling of what anyone pays.

$3.50 and $6.50 are not the same product.

The bottom of this range is shared-infrastructure, on-demand capacity — preemptible in practice, variable in performance, no dedicated fabric, and no guarantee the GPU is there tomorrow. The top is dedicated hardware on a private InfiniBand fabric with a contract behind it. Comparing them on price alone is the single most common mistake in GPU procurement.

SmartTec has not sold a GPU-hour yet.

Phase 1A — 8× HGX B200, 64 GPUs installed and 60 rentable, roughly 114 kW of IT load at an owned site in Mead, Oklahoma — targets power-on in Q4 2026. The $4.50/GPU-hr reserved figure is a published target rate for capacity that is not yet energized, not a billing history. We would rather say that plainly here than have you discover it later.

[ FAQ ]
How much does an NVIDIA B200 cost per GPU-hour in 2026?

As of July 2026, on-demand NVIDIA B200 capacity trades at a median of roughly $6.12–$6.25 per GPU-hour across independent multi-provider price trackers. The published on-demand range runs from about $3.50/GPU-hr at aggregators such as Vultr and Hyperbolic up to $14.24/GPU-hr at AWS, whose p6-b200.48xlarge instance lists at $113.93/hour for eight B200 GPUs. Mid-market specialist clouds cluster between $5.89 and $8.60: RunPod at $5.89, Lambda at $6.69, Nebius at $7.15, and CoreWeave at $8.60. SmartTec's published reserved rate for B200 capacity at its Mead, Oklahoma site is $4.50/GPU-hr, with power-on targeted for Q4 2026.

Why does the same B200 GPU cost four times more at one provider than another?

Because the price reflects the provider's cost stack, not the silicon. A hyperscaler carries metro land, retail power, global redundancy, enterprise sales and support organizations, and egress economics — AWS lists B200 at $14.24/GPU-hr because that structure requires it. A specialist neocloud strips out the general-purpose cloud and lands between $5.89 and $8.60. A marketplace resells other people's idle racks and can go below $4. SmartTec's cost stack is unusually low for a different reason: it owns its 30-acre Mead site and 3 MVA transformer outright, buys Oklahoma grid power at roughly $0.08/kWh against $0.12–0.25/kWh for leased colocation, and sources its z1power LFP battery storage at manufacturer cost from a company its founders own.

Is a $3.50/GPU-hr B200 the same as a $6.50/GPU-hr B200?

No, and the difference is the product rather than the chip. Sub-$4 B200 listings are almost always shared-infrastructure or marketplace capacity: preemptible in practice, variable in performance, without a dedicated high-speed fabric, and sold by hosts whose reliability varies widely. Rates in the $5.50–$8.60 band typically buy dedicated hardware, a private InfiniBand fabric, a support relationship, and a contract. SmartTec sells the second kind — its $4.50/GPU-hr reserved rate covers dedicated B200s on a private fabric with a named engineer, which is why the honest comparison for that price is Lambda or CoreWeave reserved capacity, not a spot marketplace listing.

Why can SmartTec price B200 capacity below the market median?

SmartTec's $4.50/GPU-hr reserved rate sits roughly 28% under the July 2026 market median of $6.25 because most of its cost stack is owned rather than rented. The company owns 30 acres in Mead, Oklahoma and a 3 MVA on-site transformer, which removes both land rent and the multi-year interconnection queue that gates most new capacity — Phase 1A's 114 kW load uses about 4% of that transformer. Power comes from the Oklahoma grid at approximately $0.08/kWh, battery storage comes from founder-owned z1power at manufacturer cost, and 100 Gbps symmetrical fiber is locked on a signed 60-month Dobson quote at $8,075/month. A competitor must buy at retail what SmartTec already holds at cost.

Are B200 rental prices expected to fall?

Most independent forecasts point down as supply arrives — some project B200 on-demand rates softening toward $2.50–$3.00/GPU-hr at scale by late 2026 as backordered units ship, and the historical precedent is that H100 rates fell roughly 35% over two years. SmartTec models this explicitly rather than assuming rates hold: its financial base case applies an annual rate decline, and Phase 1 revenue is contracted at a fixed rate for year one so that decay only affects renewals. Entry price on the hardware matters more than the decay slope, which is why SmartTec's model is built on refurbished HGX B200 systems rather than retail.